A report prepared for the State Department’s inspector general in January 2005, and obtained by TPMmuckraker, shows Blackwater’s accounting system for its no-bid, multimillion dollar Iraq contract was “not considered adequate for accumulating costs on government contracts.”
This is a companion discussion topic for the original entry at https://talkingpointsmemo.com/?p=179117